- Flight Day 1
- •
Launch
- •
Payload Bay Door Opening
- •
Ku-Band Antenna Deployment
- •
Shuttle Robotic Arm Activation
- •
Space Support Equipment Checkout
- •
Umbilical Well and Handheld External
- Tank
Video and Stills Downlink
- Flight Day 2
- •
Atlantis Thermal Protection System Survey
- with
Orbiter Boom Sensor System
- •
Extravehicular Mobility Unit Checkout
- •
Payload Bay Flight Support System
- Preparations
- •
Rendezvous Tools Checkout
- •
HST Aperture Door Closure
- •
HST Maneuver to Rendezvous and Grapple
- Attitude
- •
HST High Gain Antenna Retraction
- Flight Day 3
- •
Rendezvous with the Hubble Space
- Telescope
- •
HST Solar Arrays Positioned for Grapple
- •
HST Grapple and Berth on Flight Support
- System•
-
Shuttle Robotic Arm Survey
of HST
-
- •
EVA 1 Procedure Review
|
- Flight Day 4
-
- •
EVA 1 by Grunsfeld and Feustel (Wide
- Field
Camera III Installation, Science
- Instrument
Command and Data Handling
- Computer,
Soft Capture Mechanism
- Installation
and Latch Over Centerline Kit
- Installation)
- •
Wide Field Camera III Aliveness Test and
- Checkout
- •
SI C&DH Aliveness Checkout
- •
Bay 3 Battery Checkout
- •
EVA 2 Procedure Review
- Flight Day 5
- •
EVA 2 by Massimino and Good (Rate
- Sensor
Unit Changeout and Bay 2 Battery
- Changeout)
- •
Bay 2 Battery Checkout
- •
Rate Sensor Unit Checkout
- •
EVA 3 Procedure Review
- Flight Day 6
- •
EVA 3 by Grunsfeld and Feustel (Cosmic
- Origins
Spectrograph replaces the
- Corrective
Optics Space Telescope Axial
- Replacement
known as COSTAR and the
- repair
to the Advanced Camera for Surveys)
- •
Cosmic Origins Spectrograph Checkout
- •
ASC Checkout
|